How Long Does Sampling and Bulk Production Take?

Update Time:2025/12/20

Short, direct answer

For custom down jackets, sampling usually takes 7–14 days, and bulk production takes around 30 days after sample approval. At Ginwen, timelines are managed in-house with real-time production tracking to ensure on-time delivery.

Sampling Timeline for Custom Down Jackets


Standard Sampling Lead Time


Direct answer:

The standard sampling lead time for custom down jackets is 7–14 days.

This timeline applies to:

OEM custom designs

Private label branded samples

Fit samples, size samples, and pre-production samples

What Happens During the Sampling Stage?


Sampling is a critical step to validate design, fit, and quality before bulk production.

Sampling workflow:

Design & tech pack review

CAD pattern development & grading

Material confirmation (fabric, down filling, trims)

Cutting, sewing, and filling

Initial quality inspection

Sample delivery for approval

Because Ginwen has in-house CAD, cutting, sewing, and QC, we avoid delays caused by outsourcing.

Factors That May Affect Sampling Time


Sampling may take slightly longer if:

The design is highly complex

New fabrics or trims need sourcing

Multiple revisions are required

Special performance features are added (e.g. waterproof coating, bonded seams)

Even in these cases, we aim to keep sampling within 14 days.

Bulk Production Timeline for Custom Down Jackets


Standard Bulk Production Lead Time


Direct answer:

Bulk production for custom down jackets typically takes about 30 days after sample approval.

This timeline applies to:

OEM bulk orders

Private label bulk orders

Reorders of confirmed styles

Bulk Production Process (Step-by-Step)


Final sample approval

Material preparation & inspection

Bulk cutting & sewing

Down filling & construction

In-line quality checks

Final inspection

Packing & shipment preparation

Ginwen's monthly capacity of 500,000 pieces allows us to maintain stable timelines even during peak seasons.

What Can Affect Bulk Production Time?


Bulk lead time may vary depending on:

Order quantity

Fabric availability

Design complexity

Peak production seasons

Special packaging or labeling requirements

Our team provides real-time production updates so you always know the status of your order.

Why Ginwen Can Maintain Stable Lead Times

Ginwen's advantage lies in vertical integration and production control:

ISO 9001 & BSCI certified manufacturing systems

Strong in-house CAD & prototyping team

Automatic production processes (inspection, washing, cutting, printing, packaging)

Real-time monitoring of production progress and bottlenecks

This structure minimizes delays and reduces reliance on external suppliers.

Typical Timeline Overview (Quick Reference)

Custom Down Jackets

Final Answer (Conclusion)

Sampling for custom down jackets usually takes 7–14 days, and bulk production takes around 30 days after sample approval. At Ginwen, all key processes are handled in-house, allowing us to deliver reliable timelines without compromising quality.

If you want an exact timeline based on your design, quantity, or seasonality, the best next step is to discuss your project directly.

Are you looking for reliable manufacturers of down products?

We can quickly provide customers with market analysis, technical support and customized services.