What Is the Production Timeline for Bulk Orders?
What Is the Production Timeline for Bulk Orders?
For custom down jackets, bulk production typically takes around 30 days after final sample approval. At Ginwen, timelines are managed in-house with real-time production tracking to ensure on-time delivery.
Standard Bulk Production Lead Time
Bulk production: ~30 days after sample approval
This applies to:
OEM custom down jackets
Private label bulk orders
Men's, women's, and unisex styles
Bulk Production Process (Step-by-Step)
1. Final Sample & PP Approval
Confirm approved sample, measurements, materials, and branding
Lock tech packs, size grading, and labeling
No bulk production starts without written sample approval.
2. Material Preparation & Inspection
Fabric and lining inspection
Down or insulation verification
Trims, zippers, and accessories checks
This prevents material-related defects before cutting.
3. Cutting, Sewing & Filling
Automated cutting for accuracy
Controlled sewing and down filling
In-line quality checks on each production line
4. In-Line QC & Real-Time Monitoring
Continuous inspections during production
Real-time monitoring to identify and resolve bottlenecks early
5. Final Inspection, Packing & Shipment
Appearance, measurements, and function checks
Labeling and packaging verification
Carton checks and shipment preparation
What Can Affect Bulk Production Time?
Bulk lead time may vary depending on:
Order quantity (larger volumes may need phased scheduling)
Design complexity (special quilting, coatings, or constructions)
Material availability (new or custom fabrics/trims)
Peak seasons (pre-winter rush)
Special packaging or labeling requirements
We provide status updates during production so buyers can plan logistics confidently.
Typical Timeline Overview
Why Our Timelines Are Reliable
ISO 9001–based quality management
BSCI-compliant operations
In-house CAD, cutting, sewing, filling, and QC
Monthly capacity up to 500,000 pieces
Real-time production progress control
This structure minimizes delays and keeps delivery predictable.
Final Answer
The production timeline for bulk custom down jacket orders is approximately 30 days after final sample approval. With in-house manufacturing and real-time monitoring, Ginwen delivers stable timelines without compromising quality.
To confirm an exact schedule based on your design, quantity, or seasonality:
👉 Contact us:
Are you looking for reliable manufacturers of down products?
We can quickly provide customers with market analysis, technical support and customized services.Please send your message to us
- *Name
- *Mobile Phone
- *Title
- *Content


