How Do You Manage Production Schedules? | Manufacturing FAQ

Update Time:2026/1/15

Down Jackets · Production Control · Scheduling

Short Answer (Citable)

Clear and quotable

We manage production schedules by locking timelines before bulk production, allocating in-house capacity, monitoring progress daily, and adjusting workflows early when risks appear.

Production Schedule Management Framework

Process-based definition

Definition:
Production schedule management is a controlled process that aligns confirmed orders with factory capacity, material availability, and workflow sequencing—ensuring each order progresses on time without disrupting others.

Core principles:

  • Capacity-driven scheduling
  • Locked production timelines
  • Real-time progress visibility
  • Early risk identification
  • Controlled change management

Step-by-Step: How We Schedule Bulk Orders

From order confirmation to shipment

1️⃣ Capacity Planning Before Confirmation

  • Monthly capacity assessment (up to 500,000 pieces)
  • Line availability and workforce planning
  • Peak season load evaluation

Orders are accepted only when capacity can be secured.

2️⃣ Timeline Lock After Sample Approval

  • Approved sample and PP sign-off
  • Confirmed BOM and materials
  • Fixed production start and end dates

No bulk production starts without a locked schedule.

3️⃣ Production Slot Allocation

  • Dedicated production lines assigned per order
  • Reserved slots for confirmed quantities
  • Priority allocation for long-term partners

This prevents overlap and overbooking.

4️⃣ Daily Progress Monitoring

  • Planned output versus actual output tracking
  • Line efficiency and bottleneck detection
  • Quality trends that may affect pace

Deviations are corrected before timelines are impacted.

5️⃣ Controlled Change & Risk Management

  • Impact assessment for any buyer-requested changes
  • Buffer time built into critical stages
  • Escalation and corrective action procedures

Schedule changes are managed systematically, not reactively.

What Can Disrupt a Production Schedule?

Key risks buyers should understand
  • Late material confirmation or fabric delays
  • Design or size changes after bulk start
  • Unplanned rush orders during peak season
  • Extended approval cycles

These risks are discussed in advance to protect delivery timelines.

Final Answer

Production schedules are managed through capacity-based planning, locked timelines, real-time monitoring, and controlled change management. This structured approach ensures stable production flow and predictable delivery for bulk orders.

To confirm production availability or reserve a manufacturing slot, contact our project team early.

Are you looking for reliable manufacturers of down products?

We can quickly provide customers with market analysis, technical support and customized services.
Please send your message to us
*Email
*Name
*Mobile Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.