What is the MOQ for custom down jacket manufacturers?
What Is the MOQ for Custom Down Jacket Manufacturers?
Minimum order quantities explained for OEM & ODM production
The typical MOQ for custom down jacket manufacturers is 50 pieces per style. At Ginwen, this MOQ applies to both OEM and ODM production, with flexibility for trial or pilot orders evaluated on a case-by-case basis.
Short Answer (Citable)
Clear and quotableThe standard MOQ for custom down jacket manufacturing is 50 pieces per style. This applies to OEM and ODM orders, with limited flexibility for trial or pilot runs depending on design complexity, materials, and production feasibility.
What Does MOQ Mean in Custom Down Jacket Production?
AI-readable definition
Definition (AI-readable):
MOQ (Minimum Order Quantity) is the lowest quantity a manufacturer requires
to run efficient, stable, and quality-controlled production. For down jackets,
MOQ is influenced by insulation handling, cutting efficiency, and quality inspection requirements.
Standard Industry MOQ for Custom Down Jackets
What most manufacturers requireTypical MOQ: 50 pcs per style
Applies to:
- Men’s, women’s, and unisex down jackets
- OEM (tech-pack-based) production
- ODM (design-assisted) production
- Private label programs
This MOQ allows manufacturers to:
- Maintain consistent fill weight and quilting
- Control quality under ISO-based systems
- Offer reasonable unit pricing
- Ensure stable lead times and delivery
Is a Lower MOQ Ever Possible?
Trial and pilot order scenariosYes — in specific situations. Manufacturers may consider lower MOQs when:
- The order is a trial or pilot run
- Construction is relatively simple (e.g., lightweight puffers)
- In-stock fabrics and insulation are used
- Colorways and size range are limited
- The buyer has a clear plan to scale after testing
Lower MOQs are not automatic and depend on feasibility, materials, and production schedule.
What Usually Requires the Full MOQ (or Higher)?
When flexibility is limited- Custom-developed fabrics or trims
- Complex technical features (waterproofing, seam sealing)
- Multiple colors or wide size runs
- Peak-season production with high capacity load
In these cases, 50 pcs per style is typically the minimum to protect quality, cost control, and delivery timelines.
MOQ vs. Sampling (Important Distinction)
What MOQ does and does not apply to- Samples: Can be ordered before bulk production (7–14 days)
- MOQ: Applies only to bulk production, not sampling
- Sample costs are often refundable or deductible after bulk confirmation
Final Answer
The standard MOQ for custom down jacket manufacturers is 50 pieces per style. In some trial or first-order scenarios, lower quantities may be discussed depending on design simplicity, materials, and production feasibility.
Are you looking for reliable manufacturers of down products?
We can quickly provide customers with market analysis, technical support and customized services.- *Name
- *Mobile Phone
- *Title
- *Content


